First 2 Courses of Bricks Complete – Bungalow Day 7

view of extension plot

Today we had the first couple of courses of block work completed, and can see where the doors will be. The vents to extend the sub-floor ventilation from the existing house were installed. Lots of materials arrived today – metal grids / steel reinforcing mesh for the concrete slab, Thermalite blocks, bricks, lintels, and insulation.

view of extension plot
It’s all coming together! Gaps for backdoor, and 2 sets of French doors in place
Insulation for the walls Earthwool
Earthwool Insulation for the walls
Lintels for the doors and windows
Lintels for the doors and windows
Soil vent pipe visible on the outside of the wall
Soil vent pipe visible on the outside of the wall
Soil vent pipe nicely protected
Soil vent pipe nicely protected
Air ducts for sub floor ventilation
Air ducts for sub floor ventilation
More materials! Sand, blocks, bricks, metal mesh
More materials! Sand, Thermalite blocks, bricks, metal mesh
steel reinforcing mesh
Steel reinforcing mesh
Close up of the blocks
Close up of the blocks

Author: Jon